Skip to content
Application Suite

Applications your teams use from day one.

Shop floor, planning, process optimization, quality and maintenance run on one shared core. Whatever one application captures is available to all the others. That is why each additional one costs less than the last.

Collage: classifying a stoppage, line dashboard and control chart

01 Shop floor

Shifts that hand over cleanly.

The stoppages, tickets and KPIs of a shift are in one place. The next shift starts informed. Problems reach maintenance without a detour through paper notes or phone calls.

Shop floor walk with KPIs and OEE per shift
Shop floor walk with KPIs and OEE per shift

Benefits

  • Handover without paper notes and without searching for the current status
  • Long stoppages are classified before the shift ends
  • A walk per shift with OEE and open tickets
  • Hall display, tablet and phone show the same status

Questions the application answers

  • “What happened on the night shift?”
  • “Which stoppages are still open?”
  • “Why was OEE below plan yesterday?”
  • Shift supervisors
  • Operators
  • Maintenance

02 Production planning

Plans that match reality at the machine.

Orders, machines, tools and staff are planned together and reconciled with the ERP. Planning works with the actual run times from production, so you see a delay before a delivery date is at risk.

Order planning: plan with on-time delivery, backlog and machine loading
Order planning: plan with on-time delivery, backlog and machine loading

Benefits

  • On-time delivery and backlog at a glance
  • Planning with actual times instead of assumptions
  • Shift staffing that matches qualifications
  • Rescheduling shows its consequences before it takes effect

Questions the application answers

  • “Will we finish the order by Friday?”
  • “Which machine can run this tool?”
  • “Who steps in if someone is missing on the early shift?”
  • Production planning
  • Shift supervisors
  • Plant management

03 Process optimization

Detect deviations before scrap occurs.

Control charts show how stable a process runs today. Forecasts project every signal forward and report when it will reach a limit. The warning reaches the role that can act. Improvement projects follow a structured DMAIC approach, with data from the same source as the line KPIs.

Forecast monitoring: when a signal reaches its limit
Forecast monitoring: when a signal reaches its limit

Benefits

  • Less scrap and rework
  • Forecasts report when a signal reaches a limit
  • Process capability you can prove to customers and auditors
  • Ishikawa, 5 Why and Pareto in one place instead of in slides

Questions the application answers

  • “When will the welding force reach the action limit?”
  • “How capable is the process for this customer?”
  • “Which stoppage costs us the most time?”
  • Process experts
  • Quality
  • Production management

04 Quality

Close complaints faster.

Traceability down to the single part, 8D cases and FMEA are in one tool. When a complaint comes in, it is quickly clear which parts are affected and which are not. Every step up to closure stays traceable.

8D: root cause analysis with Ishikawa
8D: root cause analysis with Ishikawa

Benefits

  • Fewer parts blocked without need
  • 8D from D0 to the report in one case
  • AI writes the lessons learned from keywords
  • Process approvals with documented limits

Questions the application answers

  • “Which parts come from the affected batch?”
  • “Which tool was this part made with?”
  • “Is the corrective action effective?”
  • Quality
  • Complaint management
  • Process approval

05 Maintenance

Fewer unplanned stops.

Maintenance plans, work orders and spare parts are in one system, linked to the stoppages of the line. Each work order guides the technician step by step through checks, photo and signature. Requests from the shift become a work order with one click.

Work order built from inspection steps in the editor
Work order built from inspection steps in the editor

Benefits

  • Maintenance on schedule, before the equipment stops
  • Work orders with inspection steps, photo and signature on the tablet
  • Import existing maintenance lists instead of retyping them
  • Find a spare part from a photo of the nameplate

Questions the application answers

  • “What is due on line 4 today?”
  • “Is the spare part for the work order in stock?”
  • “Which request is still undecided?”
  • Maintenance
  • Setup technicians
  • Spare parts store

See tensoryze on your own data.

In one meeting we show the platform on a use case from your production.